Monday, September 2, 2019
Empennage Test Fit
The end of the fuselage kit involves rigging flight controls via pushrod lengths and shaving the stops as required. I pulled the empennage parts down from the shelf and installed everything somewhat loosely per plans. I was happy with everything and didn't see any major issues except for the rudder pedal binding discussed in a previous post about the cable links being too short. It's the little things that keep me going on this project and I really enjoyed moving the flight controls around and seeing everything move very smoothly IAW the plans.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment